Minister Mihajlovic proud of Corridor 10, says final cost yet to be determined

Minister Mihajlovic proud of Corridor 10, says final cost yet to be determined

Minister Mihajlovic proud of Corridor 10, says final cost yet to be determined Izvor: Tanjug/ DIMITRIJE GOLL

Construction, Transport and Infrastructure Minister Zorana Mihajlovic said she was proud of the completion of the Corridor 10 construction on Serbia’s territory, pointing out that she and her ministry put great efforts in the project

According to the minister, there is no final assessment of the overall costs of the highway construction yet but it is expected that the amount would exceed 350 million Euros.

Speaking for Politika daily, Mihajlovic said she was proud of the recent opening of a highway route towards North Macedonia, which is the southern leg of the Corridor 10.

“Estimated amount was 240 million Euros but it is expected that the final amount will exceed 30 million Euros. We will conduct a financial and technical analysis for the Corridor 10’s southern leg to assess the project design and the construction,” said the minister.

Comments (0)

Comment sent successfully.

Comment sending failed.

Invalid CAPTCHA

* All fields are required

MOST POPULAR

READ MORE

NEWS

NEWS

Belgrade flooded by heavy rain 17.06.2019.

17.06.2019.  |  NEWS

NEWS

NEWS

Serbian police in Montenegro for the summer 17.06.2019.

17.06.2019.  |  NEWS

NEWS

NEWS

Vesic claims e-mail shows N1 instructed to wage campaign against him 17.06.2019.

17.06.2019.  |  NEWS

NEWS

NEWS

Remains of Serbs killed in Croatia war identified 17.06.2019.

17.06.2019.  |  NEWS

NEWS

NEWS

Multi-national peacekeeping exercise ends in southern Serbia 17.06.2019.

17.06.2019.  |  NEWS

NEWS

NEWS

Serbian president announces changes at local level 17.06.2019.

17.06.2019.  |  NEWS

NEWS

NEWS

Status quo impossible, US ambassador warns 17.06.2019.

17.06.2019.  |  NEWS

NEWS

NEWS

Data Commissioner’s Office warns of obstruction 17.06.2019.

17.06.2019.  |  NEWS

loader